San Francisco Groundwater Supply Project

4 Documents in Project

Summary

SCH Number
2009122075
Lead Agency
City and County of San Francisco
Document Title
San Francisco Groundwater Supply Project
Document Type
NOD - Notice of Determination
Received
Posted
2/22/2014
Present Land Use
Various
Document Description
The San Francisco Public Utilities Commission is proposing a project which provides an average of four million gallons per day of groundwater to San Francisco's municipal water supply Groundwater would be blended with San Francisco's existing municipal water supply system for distribution within San Francisco. The project consists of the construction and operation of six potable groundwater well facilities - two that would be converted from existing irrigation well facilities and four that would be newly constructed. Each facility would include a groundwater production well and a pump station. The SFPUC would also construct a distribution system (including pipelines and connection points) that would connect five of the well facilities to Sunset Reservoir; the sixth well would connect to the existing Lake Merced Pump Station, and would require a short length of distribution piping to make this connection. The groundwater would be pumped from the North Westside Groundwater Basin, which is located within the larger Westside Groundwater Basin and underlies parts of San Francisco and San Mateo Counties.

Contact Information

Name
Tim Johnston
Agency Name
City and County of San Francisco
Contact Types
Lead/Public Agency

Location

Cities
San Francisco
Counties
San Francisco
Cross Streets
Various
Zip
Various
Total Acres
~4
Parcel #
Various
State Highways
Routes: 1, 35, and 280
Railways
Taraval/Judah MUNI lines
Schools
Various
Waterways
Pacific Ocean, Lake Merced, Spreckels Lake, Stow Lake and Chain of lakes
Township
2S
Range
6W
Base
MDB&M

Notice of Determination

Approving Agency
San Francisco Public Utilties Commission
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print