SCH Number 2024100832
Project Info
- Title
- Apex Energy Solutions, LLC CUP23-0025/IS23-0030
- Description
- Apex Energy Solutions, LLC proposes proposes the Alba Peaker BESS Project through Conditional Use Permit #23-0025 which consists of the development a 100-Megawatt (MW) Battery Energy Storage System (BESS) facility that would connect to the existing Imperial Irrigation District's 92-Kilovolt (kV) "LW." The BESS facility would include battery containers and storage sites, a control room, an on-site water storage pond/tank for fire suppression purposes, and associated facilities surrounded by fencing.
2 documents in project