Alba Peaker BESS CUP23-0025/IS23-0030
2 Documents in Project
Summary
SCH Number
2024100832
Lead Agency
Imperial County
Document Title
Alba Peaker BESS CUP23-0025/IS23-0030
Document Type
NOD - Notice of Determination
Received
Posted
12/16/2024
Document Description
The applicant proposes the Alba Peaker BESS Project through Conditional Use Permit #23-0025 which consists of the construction and operation of a 1 OD-Megawatt (MW) Battery Energy Storage System (BESS) facility that would connect to the existing Imperial Irrigation District's 92-Kilovolt (kV) "LW" line. The BESS facility would include battery containers and storage sites, an on-site switching station, an on-site water storage pond/tank for fire suppression purposes, and associated facilities surrounded by fencing. The subject parcel is approximately 6.3-acres and access to the facility is proposed via an existing private dirt road extending onto/from Drew Road.
Contact Information
Name
Jim Minnick
Agency Name
Planning and Development Services
Job Title
Director
Contact Types
Lead/Public Agency
Phone
Location
Cities
Seeley, CA 92273
Counties
Imperial
Regions
Countywide
Zip
92273
Parcel #
051-420-042-001
Notice of Determination
Approving Agency
Imperial County Planning Commission
Approving Agency Role
Lead Agency
Approved On
County Clerk
Imperial
Final Environmental Document Available at
Imperial County Planning & Development Services, 801 Main Street, El Centro, CA 92243
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.