Suisun Force Main Reliability Project
Description
FSSD is proposing to replace the existing Suisun Force Main, which was constructed in the late 1970s, with two new parallel force mains to ensure service reliability. FSSD is proposing to construct two new parallel force mains to operate in lieu of the existing force main to ensure service reliability. The existing force main would be inspected after the new parallel force mains are installed and either abandoned, repurposed, or rehabilitated as a separate project based on the inspection results. The project would also include installation of appurtenant infrastructure necessary for operation and maintenance of the force mains and stormwater improvements. The project alignment would extend between the Suisun Pump Station and the Central Pump Station, paralleling the existing alignment where possible, but would follow a different alignment compared to the existing force main.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
Fairfield Suisun Sewer District Suisun Force Main Reliability Project
Fairfield Suisun Sewer District Suisun Force Main Reliability Project