SCH Number 2024070988
Project Info
- Title
- Del Oro-Metropolitan District & New Horizons Mobile Park Water System Consolidation Project
- Description
- The City of Fresno, Department of Public Utilities proposes to consolidate the Del Oro and NHMHP water systems with the City of Fresno water system with two master metered connection points. The consolidation of the two water systems would allow the Del Oro and NHMHP water systems to provide affordable and reliable sources of safe drinking water as Del Oro and NHMHP would continue to operate their respective water system downstream of the metered connection points with the City of Fresno. The Project components include: • 8,200 linear feet (LF) of 16-inch water main along Olive Avenue from Blythe Avenue to Marks Avenue • For the Del Oro system: o 230 LF of 4-inch water main along Knoll Drive from Olive Avenue to the master meter connection point o New 4-inch master meter at Knoll Drive and Olive Avenue o New 6-inch Pressure Reducing Valve and Backflow Preventor at Knoll Drive and Olive Avenue o Destruction of one (1) existing well and one (1) tank, onsite. • For the NHMHP system: o New 4-inch master meter and service line at the connection point with the City system o New 4-inch Pressuring Reducing Valve and Backflow Preventor at the connection point with the City system o 430 LF of up to 4-inch water main along APN: 449-090-39 from the master meter connection to the existing water system o Destruction of three (3) existing wells and one (1) tank, onsite. The width and depth of ground disturbance required for trench excavation would be four to five feet and four to six feet, respectively, dependent on crossings.
2 documents in project