SCH Number 2023090665
Project Info
- Title
- Fairfield Justice Campus Asset Protection and Resiliency Project
- Description
- In order to prevent further stormwater damage, loss of function, and impairment of operations, DGS is proposing to replace or upgrade existing storm drainage facilities across approximately 4.6 acres of the project site to improve drainage and overland stormwater runoff. Specific upgrades include low barrier walls, hydraulic gates, landscaped berms, and roadway ramps on Delaware Street and Washington Street. A new Americans with Disabilities Act (ADA)-compliant plaza would be installed in front of the Hall of Justice. Pedestrian and vehicle ramps would provide access during normal operations and would also allow for emergency access during severe storm events. Additional storm drains and pump capacity are also included. The proposed project would improve security to protect operations and staff including new pedestrian facilities, lighting features, and vehicle access gates, card readers, and metal fencing.
2 documents in project