Fairfield Justice Campus Asset Protection and Resiliency Project

2 Documents in Project

Summary

SCH Number
2023090665
Lead Agency
Solano County
Document Title
Fairfield Justice Campus Asset Protection and Resiliency Project
Document Type
NOD - Notice of Determination
Received
Posted
11/22/2023
Document Description
In order to prevent further stormwater damage, loss of function, and impairment of operations, DGS is proposing to replace or upgrade existing storm drainage facilities across approximately 4.6 acres of the project site to improve drainage and overland stormwater runoff. Specific upgrades include low barrier walls, hydraulic gates, landscaped berms, and roadway ramps on Delaware Street and Washington Street. A new Americans with Disabilities Act (ADA)-compliant plaza would be installed in front of the Hall of Justice. Pedestrian and vehicle ramps would provide access during normal operations and would also allow for emergency access during severe storm events. Additional storm drains and pump capacity are also included. The proposed project would improve security to protect operations and staff including new pedestrian facilities, lighting features, and vehicle access gates, card readers, and metal fencing.

Contact Information

Name
Timothy Reynolds
Agency Name
Solano County Department of General Services
Job Title
Capital Project Coordinator
Contact Types
Lead/Public Agency

Location

Cities
Fairfield
Counties
Solano
Regions
Citywide, Countywide
Cross Streets
Texas Street, Union Avenue, Delaware Street, Clay Street
Zip
94533
Total Acres
17
Parcel #
0030-257-030 and 0030-295-140
State Highways
SR 12, I-80
Railways
UPRR
Airports
N/A
Schools
Armijo High School, Suisun and Fairfield Elementary
Waterways
Suisun Slough

Notice of Determination

Approving Agency
Solano County
Approving Agency Role
Lead Agency
Approved On
County Clerk
Solano
Final Environmental Document Available at
https://www.solanocounty.com/depts/genserv/cpm/notices.asp

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print