SCH Number 2023080057
Project Info
- Title
- South Tahoe Public Utility District
- Description
- The proposed Solar Project and associated Timber Harvest Plan is located east of the existing District wastewater treatment plant (WWTP) facility and within previously undeveloped APNs 25-061-35 and 25-071-22. The Solar Project will offset approximately one-third of the energy demands at the WWTP beginning in 2024, and consists of a secured fenced area containing the solar arrays made up of individual solar panels aligned in rows, an access roadway to the solar arrays from the District WWTP perimeter road, and underground wiring to connect the solar array switchgear to the existing WWTP electrical service connection point.
2 documents in project