South Tahoe Public Utility District Solar Project

2 Documents in Project

Summary

SCH Number
2023080057
Lead Agency
South Tahoe Public Utility District
Document Title
South Tahoe Public Utility District Solar Project
Document Type
NOD - Notice of Determination
Received
Posted
9/8/2023
Document Description
The proposed Solar Project and associated Timber Harvest Plan is located east of the existing District wastewater treatment plant (WWTP) facility and within previously un- developed APNs 25-061-35 and 25-071-22. The Solar Project will o!set approximately one-third of the energy demands at the WWTP beginning in 2024, and consists of a secured fenced area containing the solar arrays made up of individual solar panels aligned in rows, an access roadway to the solar arrays from the District WWTP perime- ter road, and underground wiring to connect the solar array switchgear to the existing WWTP electrical service connection point.

Contact Information

Name
Julie Ryan
Agency Name
South Tahoe Public Utility District
Job Title
Engineering Dept Manager
Contact Types
Lead/Public Agency

Location

Cities
South Lake Tahoe
Counties
El Dorado
Regions
Northern California
Zip
96150

Notice of Determination

Approving Agency
South Tahoe Public Utility District
Approving Agency Role
Lead Agency
Approved On
County Clerk
El Dorado
Final Environmental Document Available at
https://stpud.us/news/notices/

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print