SCH Number 2023070184
Project Info
- Title
- Annadale Development
- Description
- The project consists of the following entitlement requests: 1. A Tentative Subdivision Map to divide a 0.94-acre parcel into nine residential parcels and a common lot. 2. A Special Development Permit to A Special Development Permit to allow the proposed project to deviate from the following development standards: • Minimum Lot Width and Public Street Frontage (Section 5.4.2.C, Table 5.7.A): Up to two lots may be served off of a private drive without meeting the public street frontage requirements. The project proposes nine lots served off of a private drive. • Minimum Rear Yard Setback (Section 5.4.3.C, Table 5.7.C): The standard for minimum rear yard setback is 20 percent of the minimum lot depth. At 20 percent, the standard for: Parcel 1 is 12 feet, Parcels 2-7 is 18 feet, and Parcels 8-9 is 15 feet. The project as proposed provides a 14-foot setback for Parcel 1, a 15-foot setback for Parcels 2-7, and a 15-foot setback for parcels 8-9. • Waste Enclosure Setback from Residentially Zoned Property (Section 5.4.3.C, Table 5.8.B): The standard for waste enclosure setback from residentially zoned property is 15 feet. The project as proposed provides a setback of 0 feet. 3. A Minor Use Permit to allow the proposed project to deviate from the following development standard: • Limit on Parking Area (Section 5.9.3.F.2.f): The standard maximum percentage of land used for parking areas in the front yard is 40 percent. Parcels 3 through 6 propose 52 percent of the front yard area to be used for parking. 4. A Design Review to determine substantial compliance with the Countywide Design Guidelines. If approved, the project would demolish the existing single-family home and accessory structures located at the southwest corner of the property and would construct eight halfplex units and one single-family home with an attached accessory dwelling unit. Other proposed physical improvements include a private access drive, landscaping, and the minor extension of existing utilities.
2 documents in project