SCH Number 2023030522


Project Info

Title
Hirschdale Pipeline Project
Description
The proposed pipeline would connect to an existing water main at the intersection of Glenshire Drive and Martis Peak Road and then run eastward to Hirschdale. The pipeline alignment includes approximately 1,200 feet of undisturbed forest land on private property (APN 048-240-001) where the District has been granted permission to place the pipeline. Another approximate 1,830 feet of pipe would be installed along an existing rutted dirt road (also on private property) to the Hirschdale water tank site (APN 048-110-014) for a total of 3,030 feet of pipeline. An alternate cross-country route (Figure 2, blue line) about 665 feet long and connecting the Hirschdale water tank and existing dirt road is also proposed. The alternative pipeline alignment proposed allows a considerable reduction (of about 1,000 feet) in the length of pipeline needed by going directly northeast from the dirt road directly to the District’s Hirschdale tank site.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
Truckee Donner Public Utility District Hirschdale Pipeline Project
Truckee Donner Public Utility District Hirschdale Pipeline Project