Hirschdale Pipeline Project

2 Documents in Project

Summary

SCH Number
2023030522
Lead Agency
Truckee Donner Public Utility District
Document Title
Hirschdale Pipeline Project
Document Type
NOD - Notice of Determination
Received
Posted
5/10/2023
Document Description
The propose Hirschdale pipeline would consolidate the Hirschdale and Truckee water systems. A 4-inch pipeline would connect to an existing water main at the intersection of Glenshire Drive and Martis Peak Road and then run eastward to Hirschdale. The pipeline alignment traverses approximately 1,200 feet of undisturbed forest land on private property where the District has been granted permission to place the pipeline. Another approximate 1,830 feet of pipe would be installed along an exisitng rutted dirt road (also private property) to the Hirschdale water tank site for a total of 3,030 feet of pipeline. An alternate cross-country route about 665 feet long and connecting the Hirschdale water tank and existing dirt road is also proposed. Pipeline installation requires a 2.5-foot wide by 4-foot deep excavated trench and a construction width along the alignment of approximately 25 feet. Following construction all soils would be backfilled with material removed from the excavated trench and erosion control measures implemented to facilitate restoration of the disturbed construction area.

Contact Information

Name
Neil Kaufman
Agency Name
Truckee Donner Public Utility District
Job Title
Water System Engineer
Contact Types
Lead/Public Agency

Location

Cities
Hirschdale
Counties
Nevada
Regions
Citywide
Zip
96161
Other Location Info
APN 048-24-001, 048-110-014

Notice of Determination

Approving Agency
Truckee Donner Public Utility District
Approving Agency Role
Lead Agency
Approved On
County Clerk
Nevada
Final Environmental Document Available at
https://www.tdpud.org/departments/water/hirschdale-pipeline-project

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print