SCH Number 2023030403
Project Info
- Title
- Spring Creek Road at Fall River Bridge Replacement
- Description
- The project entails replacing the existing Spring Creek Bridge (06C0209) over the Fall River with a new bridge on the same alignment. New paved roadway approaches would be installed at both ends of the bridge. Guardrails and signage would be installed, and existing fencing would be replaced. A roadside ditch would be installed on the north side of the bridge to convey drainage away from the road. The existing bridge would be removed during construction of the new bridge.
3 documents in project