SCH Number 2023010311


Project Info

Title
Sedco Hills Septic to Sewer Project
Description
The Project would include the conversion of 699 existing septic customers to sewer by installing about 40,800 linear feet of sewer pipelines. The sewer pipelines would connect to existing sewer mains in Mission Trail, Malaga Road, or Lemon Street. Should additional engineering hydraulic analysis determine that the existing 21-inch diameter sewer main in Mission Trail requires capacity increases, a new 48-inch diameter sewer line would be installed in Mission Trail over a length of 3,200 linear feet. The Project is anticipated to generate 130,000 gallons per day of wastewater, which would be trans-ported to the EVMWD Regional Water Reclamation Facility. Existing septic tanks serving the residents would be abandoned per Riverside County Health Department requirements.
Download CSV New Search

 

4 documents in project

Type Lead/Public Agency Received Title
Elsinore Valley Municipal Water District Sedco Hills Septic to Sewer Project
Elsinore Valley Municipal Water District Sedco Hills Septic to Sewer Project
Elsinore Valley Municipal Water District Sedco Hills Septic to Sewer Project
Elsinore Valley Municipal Water District Sedco Hills Septic to Sewer Project