Sedco Hills Septic to Sewer Project

4 Documents in Project

Summary

SCH Number
2023010311
Lead Agency
Elsinore Valley Municipal Water District
Document Title
Sedco Hills Septic to Sewer Project
Document Type
NOD - Notice of Determination
Received
Posted
6/1/2023
Document Description
The Project would include the conversion of 699 septic customers to sewer by installing about 40,800 linear feet of sewer pipelines. The pipelines would connect to existing sewer mains in Mission Trail, Malaga Road, or Lemon Street. If further analysis determines that the existing 21-inch diameter sewer main in Mission Trail requires capacity increases, a new 48-inch diameter sewer line would be installed in Mission Trail over a length of 3,200 linear feet. The Project is anticipated to generate 130,000 gallons per day of wastewater, which would be transported to the EVMWD Regional Water Reclamation Facility. Existing septic tanks serving the residents would be abandoned.

Contact Information

Name
Jason Dafforn
Agency Name
Elsinore Valley Municipal Water District
Job Title
Director of Engineering and Water Resources
Contact Types
Lead/Public Agency

Location

Cities
Wildomar
Counties
Riverside
Regions
Citywide, Countywide
Cross Streets
Mission Trail, Malaga Road, or Lemon Street

Notice of Determination

Approving Agency
Elsinore Valley Municipal Water District
Approving Agency Role
Lead Agency
Approved On
County Clerk
Riverside
Final Environmental Document Available at
https://www.evmwd.com/doing-business/construction/sedco-hills-and-avenues-septic-to-sewer-conversion-project/ceqa-information

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Final Document(s) [Approved_Certified draft environmental documents]

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print