SCH Number 2023010175


Project Info

Title
Wildcat Pumping Plant Project Mitigated Negative Declaration
Description
A new 25 million gallon per day (mgd) Wildcat Pumping Plant (PP) will be constructed on East Bay Municipal Utility District (EBMUD) Property at the intersection of Road 20 and El Portal Drive to replace the existing Road 20 Portable PP, which is located on the same site alongside EBMUD’s Road 20 Rate Control Station (RCS). The project includes approximately 725 feet of new storm drain pipeline to connect the site runoff to the City of San Pablo’s existing storm drain system, and two below-ground air valves for surge protection. Upon construction completion and successful testing of the new PP, the existing Road 20 Portable PP will be removed from the site.
Download CSV New Search

 

3 documents in project

Type Lead/Public Agency Received Title
East Bay Municipal Utility District (EBMUD) Wildcat Pumping Plant Project Mitigated Negative Declaration
East Bay Municipal Utility District (EBMUD) Wildcat Pumping Plant Project Mitigated Negative Declaration
East Bay Municipal Utility District (EBMUD) Wildcat Pumping Plant Project Mitigated Negative Declaration