Wildcat Pumping Plant Project Mitigated Negative Declaration

3 Documents in Project

Summary

SCH Number
2023010175
Lead Agency
East Bay Municipal Utility District (EBMUD)
Document Title
Wildcat Pumping Plant Project Mitigated Negative Declaration
Document Type
NOD - Notice of Determination
Received
Posted
6/20/2023
Document Description
A new 25 million gallon per day (mgd) Wildcat Pumping Plant (PP) will be constructed on East Bay Municipal Utility District (EBMUD) Property at the intersection of Road 20 and El Portal Drive to replace the existing Road 20 Portable PP, which is located on the same site alongside EBMUD’s Road 20 Rate Control Station (RCS). The project includes approximately 725 feet of new storm drain pipeline to connect the site runoff to the City of San Pablo’s existing storm drain system, and two below-ground air valves for surge protection. Upon construction completion and successful testing of the new PP, the existing Road 20 Portable PP will be removed from the site.

Contact Information

Name
Anna Lau
Agency Name
East Bay Municipal Utility District
Job Title
Associate Engineer
Contact Types
Lead/Public Agency

Location

Cities
San Pablo
Counties
Contra Costa
Regions
Northern California
Cross Streets
Road 20 and El Portal Drive
Zip
94806
Schools
Walter T. Helms Middle School
Waterways
Wildcat Creek and San Pablo Creek

Notice of Determination

Approving Agency
East Bay Municipal Utility District
Approving Agency Role
Lead Agency
Approved On
County Clerk
Contra Costa
Final Environmental Document Available at
East Bay Municipal Utility District, Office of the Secretary, Room 829, 375 Eleventh Street, Oakland, CA 94607, and on the District website at: and https://www.ebmud.com/WildcatPP

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print