SCH Number 2022100226


Project Info

Title
ROLLING HILLS WATER METER PROJECT
Description
The Project entails the construction of approximately 2,750 linear feet of 12-inch Polyvinyl chloride (PVC) water main in Avenue 11, and 2,750 linear feet of 8-inch PVC water main in Mountain View Drive and Adobe Way. The alignment of this water main will be located within the County right-of-way. Any existing water main in Avenue 11 will be abandoned in place. Additionally, new water meters and meter boxes will be installed at 339 properties within the RHWS. The improvements will all be incorporated into the existing RHWS, which is currently being fed by three active wells providing safe, clean drinking water. The Project also includes a full facility refurbishment of the Well No. 2 site, including the well pump and all other well site facilities that have exceeded their life expectancy. The well casing will be sleeved if determined necessary during a well investigation. The Project also includes the addition of cathodic protection to the water storage tank.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
State Water Resources Control Board, Divison of Financial Assistance Rolling Hills Water Meter Project
State Water Resources Control Board, Divison of Financial Assistance ROLLING HILLS WATER METER PROJECT