SCH Number 2022090005


Project Info

Title
Otay Water District Trestle Bridge Demolition Project
Description
The proposed project consists of the demolition of a steel trestle and removal of an abandoned 24-inch water pipeline in the Otay Mesa area. The pipeline was replaced by the Central Area and Otay Mesa Interconnection Pipeline in 2001. The trestle also carries an abandoned high-pressure gas line that supplied the 870-1 Pump Station, which had prevented the trestle from being demolished previously. San Diego Gas & Electric (SDG&E) abandoned this gas line in 2017 and replaced it with a feed from the south. Since the existing water pipeline is no longer in service, the District intends to remove the trestle and pipeline to address liability concerns.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
Otay Water District Otay Water District Trestle Bridge Demolition Project
Otay Water District Otay Water District Trestle Bridge Demolition Project