SCH Number 2022070089
Project Info
- Title
- BART Slope Stabilization Project
- Description
- BART is proposing this project along sections of the BART alignment to reduce long-term risk to passengers, employees, and property from damaged abutment joint seals, drainage problems, and slope failure and erosion at or below BART abutment structures. BART would repair the abutments, related wayside and track drainage, and the embankment slopes at three sites in Castro Valley and two sites in Concord within the former Concord Naval Weapons Station. The repair work would take approximately 40-50 workdays at each site in Castro Valley and 55 workdays for each site in Concord.
3 documents in project