SCH Number 2022030286


Project Info

Title
San Francisco Gateway Project
Description
The proposed project would construct two new multi-story production, distribution, and repair (PDR) buildings in the Bayview Hunters Point Area Plan on a site bounded by Kirkwood Avenue to the north, Rankin Street to the east, McKinnon Avenue to the south, and Toland Street to the west. An elevated portion of Interstate 280 bisects the project site. The project would demolish four existing single-story buildings on the site that are currently occupied by PDR space, totaling 448,000 gross square feet and construct two three-story buildings. Each building would be 97 feet tall with a maximum height of 115 feet, including rooftop appurtenances. The two new buildings (including PDR space, logistics yard, vehicular circulation systems, and ground-floor retail spaces) would total 2,160,000 gross square feet. The proposed project would provide streetscape improvements to the streets immediately adjacent to the project site. The project would also construct new sidewalks, plant street trees, install stormwater control measures, and provide accessible curb ramps surrounding the project site. An Expanded Streetscape Variant is also being analyzed and would include additional right of way improvements.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
City and County of San Francisco San Francisco Gateway Project
City and County of San Francisco San Francisco Gateway Project