San Francisco Gateway Project
2 Documents in Project
Summary
SCH Number
2022030286
Lead Agency
City and County of San Francisco
Document Title
San Francisco Gateway Project
Document Type
EIR - Draft EIR
Received
Present Land Use
Production, Distribution, and Repair
Document Description
The proposed project would construct two new multi-story production, distribution, and repair (PDR) buildings in the Bayview Hunters Point Area Plan on a site bounded by Kirkwood Avenue to the north, Rankin Street to the east, McKinnon Avenue to the south, and Toland Street to the west. An elevated portion of Interstate 280 bisects the project site. The project would demolish four existing single-story buildings on the site that are currently occupied by PDR space, totaling 448,000 gross square feet and construct two three-story buildings. Each building would be 97 feet tall with a maximum height of 115 feet, including rooftop appurtenances. The two new buildings (including PDR space, logistics yard, vehicular circulation systems, and ground-floor retail spaces) would total 2,160,000 gross square feet. The proposed project would provide streetscape improvements to the streets immediately adjacent to the project site. The project would also construct new sidewalks, plant street trees, install stormwater control measures, and provide accessible curb ramps surrounding the project site.
An Expanded Streetscape Variant is also being analyzed and would include additional right of way improvements.
Contact Information
Name
Elizabeth White
Agency Name
City and County of San Francisco
Job Title
Senior Planner
Contact Types
Lead/Public Agency
Phone
Location
Cities
San Francisco
Counties
San Francisco
Regions
Citywide
Cross Streets
Toland Street, McKinnon Avenue, Rankin Street, and Kirkwood Avenue
Zip
94124
Total Acres
17.01
Jobs
1200
Parcel #
5284A/008 and 5287/002
State Highways
US 101
Schools
Big City Montessori School, Thurgood Marshall HS
Waterways
San Francisco Bay
Notice of Completion
State Review Period Start
State Review Period End
State Reviewing Agencies
California Department of Conservation (DOC), California Department of Fish and Wildlife, Bay Delta Region 3 (CDFW), California Department of Fish and Wildlife, Marin Region 7 (CDFW), California Department of Forestry and Fire Protection (CAL FIRE), California Department of Parks and Recreation, California Department of Resources Recycling and Recovery, California Department of Toxic Substances Control (DTSC), California Department of Transportation, District 4 (DOT), California Department of Transportation, Division of Transportation Planning (DOT), California Department of Water Resources (DWR), California Energy Commission, California Governor's Office of Emergency Services (OES), California Highway Patrol (CHP), California Native American Heritage Commission (NAHC), California Natural Resources Agency, California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, San Francisco Bay Region 2 (RWQCB), California State Lands Commission (SLC), Office of Historic Preservation, San Francisco Bay Conservation and Development Commission (BCDC), State Water Resources Control Board, Division of Water Quality, California Air Resources Board (ARB)
State Reviewing Agency Comments
California Air Resources Board (ARB)
Development Types
Industrial (Sq. Ft. 2160000, Acres 17.01, Employees 1200)
Local Actions
General Plan Amendment, Rezone, Use Permit
Project Issues
Air Quality, Cumulative Effects, Noise, Traffic/Circulation
Attachments
Draft Environmental Document [Draft IS, NOI_NOA_Public notices, OPR Summary Form, Appx,]
Notice of Completion [NOC] Transmittal form
State Comment Letters [Comments from state reviewing agencies]
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.