SCH Number 2022020213


Project Info

Title
Well No. 9 and Conveyance Pipeline Project
Description
The project would upgrade the Ivanhoe PUD water supply system to increase the water supply capacity to help it meet existing and projected future water demands and satisfy water quality requirements, and upgrade the water distribution and delivery system to eliminate an existing substandard pipeline. In order to achieve these objectives, the Ivanhoe PUD is proposing the following: (1} construction of a new water supply well (Well No. 9); (2) installation of an 8-inch diameter conveyance pipeline that connects to the Ivanhoe PU D's existing water distribution system; and (3) installation of 26 water services connected to the new pipeline.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
Ivanhoe Public Utility District Well No. 9 and Conveyance Pipeline Project
Ivanhoe Public Utility District Well No. 9 and Conveyance Pipeline Project