Well No. 9 and Conveyance Pipeline Project

2 Documents in Project

Summary

SCH Number
2022020213
Lead Agency
Ivanhoe Public Utility District
Document Title
Well No. 9 and Conveyance Pipeline Project
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
AE-20: Exclusive Agriculture (20 acre minimum)
Document Description
The project would upgrade the Ivanhoe PUD water supply system to increase the water supply capacity to help it meet existing and projected future water demands and satisfy water quality requirements, and upgrade the water distribution and delivery system to eliminate an existing substandard pipeline. In order to achieve these objectives, the Ivanhoe PUD is proposing the following: (1} construction of a new water supply well (Well No. 9); (2) installation of an 8-inch diameter conveyance pipeline that connects to the Ivanhoe PU D's existing water distribution system; and (3) installation of 26 water services connected to the new pipeline.

Contact Information

Name
Dennis R. Keller
Agency Name
Dennis R. Keller Consulting Civil Engineer, Inc.
Job Title
District Consulting Engineer
Contact Types
Consulting Firm

Name
Carol Fina
Agency Name
Ivanhoe Public Utility District
Job Title
Secretary
Contact Types
Lead/Public Agency

Location

Cities
Ivanhoe
Counties
Tulare
Regions
Unincorporated
Cross Streets
Avenue 324 and Road 156
Zip
93235
Total Acres
2.6
Parcel #
108-270-004
State Highways
216
Railways
Southern Pacific
Airports
None
Schools
Ivanhoe Elementary School
Waterways
Kaweah River
Township
18S
Range
25E
Section
11
Base
MDB&M

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Conservation (DOC), California Department of Fish and Wildlife, Central Region 4 (CDFW), California Department of Forestry and Fire Protection (CAL FIRE), California Department of Parks and Recreation, California Department of Toxic Substances Control (DTSC), California Department of Transportation, District 6 (DOT), California Department of Water Resources (DWR), California Highway Patrol (CHP), California Native American Heritage Commission (NAHC), California Natural Resources Agency, California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, Central Valley Fresno Region 5 (RWQCB), California State Lands Commission (SLC), Central Valley Flood Protection Board, Office of Historic Preservation, State Water Resources Control Board, Division of Drinking Water, State Water Resources Control Board, Division of Drinking Water, District 12, State Water Resources Control Board, Division of Drinking Water, District 24, State Water Resources Control Board, Division of Water Quality, State Water Resources Control Board, Division of Water Rights, State Water Resources Control Board, Divison of Financial Assistance
Development Types
Water Facilities (Groundwater Well, Hydropneumatic Tank, Water Pipeline)(Type Water Supply, MGD 1.1)
Local Actions
Improvements
Project Issues
Biological Resources
Public Review Period Start
Public Review Period End

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print