SCH Number 2021120437


Project Info

Title
Honcut School Water System Improvement Project
Description
The project includes improvements to the Honcut School Water System that are required in order to replace aging infrastructure, comply with BCPHD requirements, and ensure a safe and reliable water supply for students and teachers. In addition to constructing a new well, improvements include the following items: • Constructing a new concrete masonry well building to house the new well, with a separate room for chemical dosing equipment; • Installing a 50-gallons-per-minute submersible well pump; • Installing a day tank, pump, and appurtenances to dose the well water with sodium hypochlorite; • Installing a 400-gallon hydropneumatic tank; • Installing new piping and appurtenances to connect the new well to Classroom 3 and the irrigation system; • Installing an automatic transfer switch and an electrical conduit to connect to a future generator; • Installing fencing to protect the well building; • Destroying the old well per Department of Water Resources requirements; and, • Removing the building and all above-ground appurtenances associated with the old well. Staging of materials and construction equipment would occur within school-owned parcels. Site preparation and grading would be required; however, no trees would be removed.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
Palermo Union School District Honcut School Water System Improvement Project
Palermo Union School District Honcut School Water System Improvement Project