SCH Number 2021060606


Project Info

Title
Bishop Pavement
Description
The Department of Transportation (Caltrans) project proposes to rehabilitate pavement on all travel lanes on U.S. Route 395 from 0.1 mile south of Jay Street (Post Mile - PM114.9) to Barlow Lane (PM 117.8) and on State Route 168 between Pioneer Lane (PM 17.6) and Main Street / U.S. Route 395 (PM 18.3). In addition to pavement rehabilitation, the project will, construct a multiuse path from near Wye Road to See Vee Lane, upgrade drainage at various locations, replace sidewalk, curb ramps, and driveways at locations where drainage work is done and from Line Street to Academy Avenue, relocate traffic signal poles at 3 corners of the U.S. Route 395 and State Route 168 intersection, upgrade pedestrian signal controls, construct enhanced pedestrian facilities on Highway 395 at Clarke Street, Academy Street and Mac Iver Street, construct a pedestrian hybrid beacon on U.S. Route 395 at the Sierra Street Bike Path crossing, and replace Transportation Management Systems (TMS) count stations within the project limits. Removing parking from State Route 168 within the project limits to create bike lanes is a project design option.
Download CSV New Search

 

3 documents in project

Type Lead/Public Agency Received Title
California Department of Transportation, District 9 (DOT) Bishop Pavement
California Department of Transportation, District 9 (DOT) Bishop Pavement
California Department of Transportation, District 9 (DOT) Bishop Pavement