SCH Number 2021060364


Project Info

Title
CRFREE Mitigation Pipeline Undergrounding Project
Description
The purpose of the project is to replace existing wastewater pipelines that currently span the south arm of the Carmel River Lagoon with new pipelines installed deep below the bed of the lagoon so that they would not be subject to damage by increased river flows in the south arm created by the CRFREE project being proposed by Monterey County. The new pipelines are proposed to be installed under the lagoon by means of horizontal directional drilling installation methods in order to minimize the amount of ground disturbance required to install replacement pipelines. Once the new pipelines are installed and connected to the existing pipes on either side of the lagoon, the existing aerial pipe structure crossing over the south arm of the Carmel River Lagoon will be removed.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
Carmel Area Wastewater District (CAWD) CRFREE Mitigation Pipeline Undergrounding Project
Carmel Area Wastewater District (CAWD) CRFREE Mitigation Pipeline Undergrounding Project