CRFREE Mitigation Pipeline Undergrounding Project

2 Documents in Project

Summary

SCH Number
2021060364
Lead Agency
Carmel Area Wastewater District (CAWD)
Document Title
CRFREE Mitigation Pipeline Undergrounding Project
Document Type
NOD - Notice of Determination
Received
Posted
8/26/2021
Document Description
The purpose of the project is to replace existing wastewater pipelines that currently span the south arm of the Carmel River Lagoon with new pipelines installed deep below the bed of the lagoon so that they would not be subject to damage by increased river flows in the south arm created by the CRFREE project being proposed by Monterey County. The new pipelines are proposed to be installed under the lagoon by means of horizontal directional drilling installation methods in order to minimize the amount of ground disturbance required to install replacement pipelines. Once the new pipelines are installed and connected to the existing pipes on either side of the lagoon, the existing aerial pipe structure crossing over the south arm of the Carmel River Lagoon will be removed.

Contact Information

Name
Patrick Treanor
Agency Name
Carmel Area Wastewater District
Contact Types
Lead/Public Agency

Location

Cities
Carmel-by-the-Sea
Counties
Monterey
Regions
Unincorporated
Cross Streets
Calle La Cruz
Zip
93923
Total Acres
10
Parcel #
APN 243-021-007, APN 243-011-001, APN 243-031-037
State Highways
State Route 1
Railways
N/A
Airports
N/A
Schools
N/A
Waterways
Carmel River
Township
T16S
Range
R1W
Section
S14
Other Location Info
Existing Pipelines Crossing Carmel River Lagoon

Notice of Determination

Approving Agency
Carmel Area Wastewater District
Approving Agency Role
Lead Agency
Approved On
County Clerk
Monterey
Final Environmental Document Available at
CEQA.net and www.cawd.org

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Final Document(s) [Approved_Certified draft environmental documents]

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print