- First Industrial Warehouse at Rider Street and Redlands Avenue Project, DPR 19-00016
- Description
- The proposed First Industrial Warehouse at Rider Street and Redlands Avenue Project (Project) involves the construction and operation of an approximately 324,147-square-foot industrial, non-refrigerated warehouse distribution facility, with 8,000 SF of office space and 4,000 square feet of mezzanine space on 16.25-acre (gross) site, of which approximately 1.40 acres will go for street dedication, for a net site area of 14.85-acres. The speculative warehouse/distribution use is assumed to operate 24 hours a day 7 days a week. The Project includes minimal subsurface storm drain and will utilize curb and gutter, curb cuts, and valley gutters to convey on-site flows to four proposed water quality basins and an underground storage system. Additionally, two subsurface storm drain lines will be constructed on-site to convey flows into the underground storage chambers. The storm drain system then collects the treated flows and higher degree flows from the bio-retention facilities on-site and underground storage chamber and conveys them to existing storm drain Line A-B, located within Rider Street which drains into the Perris Valley Storm Drain Channel. Access to the Project site will be available from Redlands Avenue and Rider Street via three driveways; the south most driveway on Redlands Avenue and the driveways on Rider Street have direct access to the truck yard. Trucks would use the PVCCSP-designated truck routes to travel to and from the Project site. Partial-width improvements will be constructed on east side of Redlands Avenue and the south side of Rider Street adjacent to Project site, including medians, curb and gutter, and sidewalk. Existing power poles along the Project frontage of Redlands Avenue will be removed and undergrounded. The Project includes the following discretionary actions the by the City: adoption of the Mitigated Negative Declaration (MND 2358) in compliance with the requirements of the California Environmental Quality Act (CEQA), and approval of Development Plan Review (DPR No. 19-00016) to allow for development of the Project site with an approximately 324,147- square-foot warehouse facility.
2 documents in project