SCH Number 2021040415
Project Info
- Title
- Palo Verde Union Elementary School District Water System Improvement Project
- Description
- The Project proposes to drill and construct a new domestic standard well (Well No. 3) for the school at the location illustrated in . The new well is expected to yield about 300 gpm. In addition to the construction of Well No. 3, the following items will also be constructed: • A 10,000-gallon pressure tank. The pressure tank will measure approximately 20 feet in height and approximately 30 feet in diameter and will be located at the new well site. • A gate valve with valve box • Backflow preventer • 15hp booster pump • 6 ft high chain link fence around new well and appurtenant facilities, with a 30-ft wide double drive gate. • 166 linear feet (LF) of new water distribution line (using open-trench method of construction installation) • 500-LF of new irrigation main to all valve boxes from the well. These Project components contained within the APE as defined above, are illustrated in Figure 2 2. In addition to constructing a well, associated infrastructure, and water pressure tank, the Project proposes to abandon the Well No. 1, per Tulare County standards and remove the associated existing 10,000 gal. water pressure tank, pump and electrical service.
2 documents in project