Palo Verde Union Elementary School District Water System Improvement Project
2 Documents in Project
Summary
SCH Number
2021040415
Lead Agency
Palo Verde Union Elementary School District
Document Title
Palo Verde Union Elementary School District Water System Improvement Project
Document Type
NOD - Notice of Determination
Received
Posted
6/15/2021
Document Description
The Project proposes to drill and construct a new domestic standard well (Well No. 3) for the school at the location illustrated in . The new well is expected to yield about 300 gpm. In addition to the construction of Well No. 3, the following items will also be constructed:
• A 10,000-gallon pressure tank. The pressure tank will measure approximately 20 feet in height and approximately 30 feet in diameter and will be located at the new well site.
• A gate valve with valve box
• Backflow preventer
• 15hp booster pump
• 6 ft high chain link fence around new well and appurtenant facilities, with a 30-ft wide double drive gate.
• 166 linear feet (LF) of new water distribution line (using open-trench method of construction installation)
• 500-LF of new irrigation main to all valve boxes from the well.
These Project components contained within the APE as defined above, are illustrated in Figure 2 2. In addition to constructing a well, associated infrastructure, and water pressure tank, the Project proposes to abandon the Well No. 1, per Tulare County standards and remove the associated existing 10,000 gal. water pressure tank, pump and electrical service.
Contact Information
Name
Phil Anderson
Agency Name
Interim Superintendent
Contact Types
Lead/Public Agency / Project Applicant
Phone
Location
Coordinates
Cities
Tulare
Counties
Tulare
Regions
Unincorporated
Cross Streets
Avenue 196 to the north and Road 96 to the west
Zip
93274
Total Acres
0.25 acres
Parcel #
174-150-025
State Highways
99
Railways
NA
Airports
Mefford Field Airport
Schools
Palo Verde Union Elementary
Waterways
Elk Bayou Ditch
Township
20s
Range
24e
Section
34
Base
MDB&M
Notice of Determination
Approving Agency
Palo Verde Union Elementary School District
Approving Agency Role
Lead Agency
Approved On
County Clerk
Tulare
Final Environmental Document Available at
9637 Ave 196, Tulare 93274
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.