SCH Number 2020110344
Project Info
- Title
- La Jolla Innovation Center Project
- Description
- The Project proposes a seven-story above-grade building that would include five levels of UC San Diego Health Sciences and UC San Diego Extension uses and two levels of parking, as well as two subterranean parking levels (four parking levels total). The building would be a maximum of 100 feet in height from the existing ground level. The building would include 103,314 gross square feet (GSF) associated with office and educational uses. Approximately 1,420 GSF of ground-floor retail space (such as a café) would be provided within Parking Level P3 at the southeastern corner of the building. The Project would provide approximately 275 parking spaces spread between a four-level, 94,799-GSF parking garage and surface parking. Vehicular access to the Project site would be provided by the two existing driveways to the commercial center from Villa La Jolla Drive and the Villa Norte cul-de-sac. Pedestrian access to the Project site would be provided via a new sidewalk connection to La Jolla Village Drive and via an existing City owned pedestrian bridge that crosses La Jolla Village Drive and provides direct access to the Health Sciences portion of the UC San Diego campus. Utility connections would be required to provide potable water, sanitary sewer, storm drains, and electrical power to the Project site. The proposed Project would establish connections to these existing utilities located in the Project area. The interior of the building would be designed to allow for flexibility of use by UC San Diego School of Medicine and UC San Diego Extension. Building occupancy is estimated at approximately 947 individuals based upon the anticipated uses, and the maximum occupancy of the building would be approximately 2,027 individuals based upon City of San Diego egress requirements. The Project would comply with the current California Green Building Standards Code (CALGreen) and Leadership in Energy and Environmental Design (LEED) parking and bicycle storage requirements. On-site parking would include 7 accessible parking stalls (including 2 van stalls) located within the parking structure; the 2 accessible parking stalls (including 1 van stall) that would be removed during demolition of the existing surface parking would be replaced. Per CALGreen requirements, approximately 8 percent of the total stalls provided are required to be designated for clean air vehicles and 6 percent wired for electric vehicle charging; a total of 23 clean air vehicle stalls and infrastructure for 17 electric vehicle charging stations would be provided. A total of 28 bicycle spaces, including 14 long-term bicycle parking stalls within the parking structure and 14 spaces in bicycle parking racks outside the building adjacent to the building entry at the south side of the Project, are proposed.
5 documents in project
Type | Lead/Public Agency | Received | Title |
---|---|---|---|
NOD | University of California | Approval of the Acquisition of Land and Transaction Documents, UC San Diego La Jolla Innovation Center Project | |
NOD | University of California | UC San Diego La Jolla Innovation Center Project | |
FIN | University of California San Diego | La Jolla Innovation Center Project | |
EIR | University of California San Diego | UC San Diego La Jolla Innovation Center Project | |
NOP | University of California San Diego | La Jolla Innovation Center |