SCH Number 2020099008


Project Info

Title
Auburn Boulevard Bridge Replacement Project
Description
The proposed project consists of the replacement of the existing structurally deficient bridge with a new bridge that meets current structural and geometric design standards, improves hydraulic capacity, and provides traffic-rated barrier railings. The proposed bridge replacement would also enhance the Auburn Boulevard and Winding Way intersection by adding an additional left turn pocket from westbound Auburn Boulevard to Winding Way. The proposed replacement bridge would be a single span precast-prestressed concrete girder bridge, placed along the existing bridge alignment. The proposed bridge would be approximately 97 feet in width and would provide two 12-foot through lanes, two 11 -foot through lanes, two 11-foot left turn lanes, and shoulders and sidewalks in each direction. The length of the proposed bridge would be approximately 89 feet to avoid the existing bridge foundations.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
City of Sacramento Auburn Boulevard at Arcade Creek Bridge Replacement Project
City of Sacramento Auburn Boulevard Bridge Replacement Project