Auburn Boulevard at Arcade Creek Bridge Replacement Project

2 Documents in Project

Summary

SCH Number
2020099008
Lead Agency
City of Sacramento
Document Title
Auburn Boulevard at Arcade Creek Bridge Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
12/10/2020
Present Land Use
Bridge
Document Description
The Project proposes to replace the existing structurally deficient bridge with a new bridge that meets current structural and geometric design standards, improves hydraulic capacity, and provides traffic-rated barrier railings. The proposed bridge replacement would also enhance the Auburn Boulevard and Winding Way intersection by adding an additional left turn pocket from westbound Auburn Boulevard to Winding Way. The proposed replacement bridge would be a single-span precast-prestressed concrete girder bridge, placed along the existing bridge alignment. The proposed bridge would be approximately 97 feet in width and would provide two 12-foot through vehicle lanes, two 11-foot through lanes, two 11-foot left turn lanes, and shoulders and sidewalks in each direction. The length of the proposed bridge would be approximately 89 feet to avoid the existing bridge foundations.

Contact Information

Name
Ron Bess
Agency Name
City of Sacramento
Contact Types
Lead/Public Agency

Name
Agency Name
City of Sacramento
Contact Types
Project Applicant

Location

Cities
Sacramento
Counties
Sacramento
Regions
Northern California
Cross Streets
Auburn Boulevard at Arcade Creek

Notice of Determination

Approving Agency
City of Sacramento
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print