SCH Number 2020090234


Project Info

Title
Pad D Standby Well
Description
The City of East Palo Alto proposes to construct a standby groundwater supply well with an instantaneous pumping capacity of between approximately 350 and 500 gpm, that would be able to utilize limited groundwater from the proposed Pad D Well consistent with California Code of Regulations, Title 22, Chapter 15, Section 64414 paragraph (c). The proposed project facilities include, but are not limited to, the well and well pump, a chemical amendment system, a hydro-pneumatic/surge tank with connection for tank filling, pipe connections to the City’s existing water distribution system, a potential future iron and manganese treatment system (with backwash holding tank, backwash holding tank decant water pumps, and water blending with a higher quality water source) or an emergency water storage tank.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
City of East Palo Alto Pad D Standby Well
City of East Palo Alto Pad D Standby Well