Pad D Standby Well

2 Documents in Project

Summary

SCH Number
2020090234
Lead Agency
City of East Palo Alto
Document Title
Pad D Standby Well
Document Type
NOD - Notice of Determination
Received
Posted
12/21/2020
Present Land Use
Vacant Land
Document Description
The City proposes to construct a standby groundwater supply well with an instantaneous pumping capacity of between approximately 350 and 500 gpm, that would be able to utilize limited groundwater, consistent with CCR, Title 22, Chapter 15, Section 64414 paragraph (c). The proposed project facilities include, but are not limited to, the well and well pump, a chemical amendment system, a hydropneumatic/surge tank with connection for tank filling, pipe connections to the City’s existing water distribution system, a potential future iron and manganese treatment system (with backwash holding tank, backwash holding tank decant water pumps, and water blending with a higher quality water source) or an emergency water storage tank.

Contact Information

Name
Kamal Fallaha
Agency Name
City of East Palo Alto
Contact Types
Lead/Public Agency

Name
Agency Name
City of East Palo Alto
Contact Types
Project Applicant

Location

Cities
East Palo Alto
Counties
San Mateo
Cross Streets
East Bayshore Blvd and Clarke Avenue, City of East Palo Alto, San Mateo County

Notice of Determination

Approving Agency
City Council
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.