SCH Number 2020060453


Project Info

Title
Maple Canyon Storm Drain
Description
Capital Improvement Project to replace 16 storm drain systems throughout Bankers Hill that outfall into Maple Canyon and construct 1 new storm drain system within Maple Street between state street and the downstream end of Maple Canyon. Storm Drain sizes vary between 18 to 48-inches. Project work will also include storm drain inlets, cleanouts, energy dissipators, trench resurfacing, pavement resurfacing, curb ramps, sidewalk, curb and gutter, retaining wall, street repair, and revegetation. Replacement and extension shall result in approximately 4,166 linear feet of RCP installation. In addition, retaining walls, curb ramps, street resurfacing, salvage and replacement of guard rails and street lights where needed, traffic control, including pedestrian controls into the canyon and best management practices (BMPs), would be included as part of the project scope. The project site is located within a natural canyon near Maple Street in the Uptown Community Plan Area and City Council District 3. The site is not included on any Government Code listing of hazardous waste sites.
Download CSV New Search

 

3 documents in project

Type Lead/Public Agency Received Title
City of San Diego Maple Canyon Restoration
City of San Diego Maple Canyon Restoration
City of San Diego Maple Canyon Storm Drain