Maple Canyon Restoration
3 Documents in Project
Summary
SCH Number
2020060453
Lead Agency
City of San Diego
Document Title
Maple Canyon Restoration
Document Type
NOD - Notice of Determination
Received
Posted
4/1/2021
Document Description
Capital Improvement Project to replace 16 storm drain systems throughout Bankers Hill that outfall into Maple Canyon and construct 1 new storm drain system within Maple Street between state street and the downstream end of Maple Canyon. Storm Drain sizes vary between 18 to 48-inches. Project work will also include storm drain inlets, cleanouts, energy dissipators, trench resurfacing, pavement resurfacing, curb ramps, sidewalk, curb and gutter, retaining wall, street repair, and revegetation. Replacement and extension shall result in approximately 4,166 linear feet of RCP installation. In addition, retaining walls, curb ramps, street resurfacing, salvage and replacement of guard rails and street lights where needed, traffic control, including pedestrian controls into the canyon and best management practices (BMPs), would be included as part of the project scope. The project site is located within a natural canyon near Maple Street in the Uptown Community Plan Area and City Council District 3.
Contact Information
Name
Jamie Kennedy
Agency Name
City of San Diego
Contact Types
Lead/Public Agency
Phone
Email
Location
Coordinates
Cities
San Diego
Counties
San Diego
Regions
Citywide
Cross Streets
West Maple Street and Albatross Street
Zip
92103
Total Acres
5.86
Parcel #
Various
State Highways
163, 5, 8, 94
Railways
MTS
Airports
San Diego International Airport
Schools
San Diego High School
Waterways
San Diego Bay
Notice of Determination
Approving Agency
City of San Diego
Approving Agency Role
Lead Agency
Approved On
County Clerk
San Diego
Final Environmental Document Available at
City of San Diego
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.