SCH Number 2019129012


Project Info

Title
SR70, Segment 3, Safety and Passing Lanes
Description
Caltrans proposes to widen SR 70 from a two-lane highway to five-lane facility with a paved center two-way-turn lane (TWTL) median for approximately 4.0 miles north of the existing Honcut bridges. At Honcut Creek, a new two-lane bridge structure will be constructed to span the flood plain over the levee prism and provide additional lanes of southbound traffic. The existing bridges will be converted to northbound-only traffic. The project proposes to acquire 28.7 acres of right of way and proposes to provide mitigation for riparian take within the levee prism (approximately 1 acre) and for greenhouse gas effect/offset as a result of highway widening and increased capacity.
Download CSV New Search

 

5 documents in project

Type Lead/Public Agency Received Title
California Department of Transportation, District 3 (DOT) Butte 70 Corridor Improvement Project, Segment 3 EA 03-3H930
California Department of Transportation, District 3 (DOT) Permit No. 19540: State Route 70 – Segment 3 Corridor Improvement Project: Honcut Creek Bridge
California Department of Transportation, District 3 (DOT) State Route 70 - Segment 3 Corridor Improvement Project
California Department of Transportation, District 3 (DOT) State Route 70 (SR 70)—Segment 3 Corridor Improvement Project
California Department of Transportation, District 3 (DOT) SR70, Segment 3, Safety and Passing Lanes