SCH Number 2019109083
Project Info
- Title
- Via Verdi Slope Stabilization Project
- Description
- The proposed Via Verdi Slope Stabilization Project (project) would reconstruct a segment of the Via Verdi roadway that was damaged by a landslide in 2017; the road was closed at that time and a temporary emergency roadway currently provides access to the Sobrante Glen neighborhood. Reconstruction of the roadway requires installation of a concrete box culvert within San Pablo Creek, back-filled with engineered fill. to buttress the landslide and provide a stabilized footing for the roadway embankment. An offsite mitigation area is included as part of the project
3 documents in project
Type | Lead/Public Agency | Received | Title |
---|---|---|---|
NOD | City of Richmond | Major Amendment to the Via Verdi Slope Stabilization Project (Streambed Alteration Agreement No. 1600-2019-0169-R3) | |
NOD | City of Richmond | Via Verdi Slope Stabilization Project (Streambed Alteration Agreement No. 1600-2019-0169-R3) | |
MND | City of Richmond | Via Verdi Slope Stabilization Project |