SCH Number 2019099065
Project Info
- Title
- Amethyst Road Pipeline Alignment Project
- Description
- The Amethyst Road Pipeline Alignment Project (proposed Project) was developed to import water from the Mojave Water Agency (MWA) to ultimately store the imported water in the local groundwater aquifer, thus improving groundwater reliability for the VWD. The proposed Project would provide for the conveyance of R3 Project water from the MWA's infrastructure along Mesa Road to VWD's Turnout No. 5 pumping station within the City's water facility at Sycamore Street and Amethyst Road. The 24-inch transmission pipeline as proposed would originate at the northwest corner of Mesa Street and Amethyst Road via a connection to MWA's pipeline infrastructure; extend for approximately 1 mile, or up to 5,500 linear feet, generally along Amethyst Road; and then continue west on Sycamore Street to the intersection with Amethyst Road (the Project Site).
3 documents in project
Type | Lead/Public Agency | Received | Title |
---|---|---|---|
NOD | City of Victorville | Amethyst Water Pipeline Project (Western Joshua Tree Conservation Act (WJTCA) Incidental Take Permit No. 1927-ITP-2023-010-06 (ITP)) | |
NOD | City of Victorville | Amethyst Road Pipeline Alignment Project | |
MND | City of Victorville | Amethyst Road Pipeline Alignment Project |