Amethyst Water Pipeline Project (Western Joshua Tree Conservation Act (WJTCA) Incidental Take Permit No. 1927-ITP-2023-010-06 (ITP))

3 Documents in Project

Summary

SCH Number
2019099065
Lead Agency
City of Victorville
Document Title
Amethyst Water Pipeline Project (Western Joshua Tree Conservation Act (WJTCA) Incidental Take Permit No. 1927-ITP-2023-010-06 (ITP))
Document Type
NOD - Notice of Determination
Received
Posted
11/4/2024
Document Description
This proposed project involves installation of approximately 1 mile of a new subsurface 24-inch water pipeline along Amethyst Road. Project Activities include grubbing and grading of the work area, vegetation removal, digging a trench between 5 to 10 feet wide by 5 feet deep to accommodate a new pipeline installation within a 100-ft wide work area approximately 12.79 acres, excavation, stockpiling and backfilling, and other activities. The Project will result in incidental take of 39 western Joshua tree (Yucca brevifolia). which is protected under the WJTCA and the California Endangered Species Act. The WJTCA ITP referenced above as issued by CDFW authorizes incidental take of western Joshua tree that may occur as a result of Project implementation.

Contact Information

Name
Julia Karo
Agency Name
Fish and Wildlife, Region 6
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Location

Counties
San Bernardino
Regions
Southern California
Parcel #
3128-031-01-0000
Township
4N
Range
5W
Section
1,2,11

Notice of Determination

Approving Agency
Fish and Wildlife, Region 6
Approving Agency Role
Responsible Agency
Approved On
County Clerk
San Bernardino
Final Environmental Document Available at
City of Victorville 14343 Civic Drive Victorville, CA 92392

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.