SCH Number 2019069092
Project Info
- Title
- Orange Memorial Park Water Capture Project
- Description
- The proposed Project would result in the construction and operation of a water capture facility through the installation of a drop inlet, diversion channel, and inlet junction structure in the upper and western end of the Colma Creek channel and Orange Memorial Park (Park). Captured water would be diverted into a series of storm pipes and pretreatment chambers that would lead to an underground stormwater storage reservoir in the southeastern corner of the Park. A portion of the storage would function as a cistern holding water for eventual non-potable irrigation use in and around the Park, and the remainder would function as an infiltration chamber. The storage facilities would be constructed underneath a portion of two ballfields.
2 documents in project