SCH Number 2019049087


Project Info

Title
Biola Groundwater Recharge Project
Description
The proposed Project includes four components: 1. Installation of a turnout valve with a flow meter in the Fresno Irrigation District (FID) Herndon Canal. 2. Installation of approximately 2,075 linear feet of 18-inch pipeline to connect the turnout valve with an existing storm drain pipeline . 3. A three-acre expansion of an existing two-acre storm drainage basin for a five-acre total groundwater recharge basin. 4. Installation of a six-foot chain link fence a round the enlarged drainage basin.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
Biola Community Services District (BCSD) Biola Groundwater Recharge Projecttment System
Biola Community Services District (BCSD) Biola Groundwater Recharge Project