Biola Groundwater Recharge Projecttment System

2 Documents in Project

Summary

SCH Number
2019049087
Lead Agency
Biola Community Services District
Document Title
Biola Groundwater Recharge Projecttment System
Document Type
NOD - Notice of Determination
Received
Posted
7/23/2019
Project Applicant
Biola Community Services District System

Document Description
The proposed Project includes four components: 1. Installation of a turnout valve with a flow meter in the Fresno Irrigation District (FID) Herndon Canal. 2. Installation of approximately 2,075 linear feet of 18-inch pipeline to connect the turnout valve with an existing storm drain pipeline. 3. A three-acre expansion of an existing two-acre storm drainage basin for a five -acre total groundwater recharge basin. 4. Installation of a six-foot chain link fence around the enlarged drainage basin.

Contact Information
Felipe Perez
Biola Community Services District
4925 N. Seventh St.
Biola, CA 93606

Phone : (559) 843-2657

Location

Cities
Biola
Counties
Fresno

Notice of Determination

Approving Agency
Biota Community Services District
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
Biota CSD, 4925 N. Seventh Street, Biola, CA 93606

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination
2019049087_Biola stamped NOD and receipt   PDF 866 K
Download CSV New Search