SCH Number 2019039040


Project Info

Title
Draft Environmental Impact Report - BAE Systems Waterfront Improvement Project
Description
The proposed project would replace aging structures, improve existing infrastructure, increase space utilization, and increase efficiency of operations at the existing BAE Systems San Diego Ship Repair Yard. While these improvements would allow for newer and different classes of vessels to be moored and repaired on site, the proposed improvements are not expected to increase the number of vessels serviced as no new berthing space would be provided and the mooring of new, larger vessels would reduce the number of other vessels that could be concurrently moored at the ship repair yard. The proposed project includes 15 distinct project elements designed to improve efficiency and functionality of the existing BAE Systems San Diego Ship Repair Yard.
Download CSV New Search

 

4 documents in project

Type Lead/Public Agency Received Title
San Diego Unified Port District Fender Systems Replacement Project
San Diego Unified Port District BAE Systems Waterfront Improvement Project
San Diego Unified Port District Draft Environmental Impact Report - BAE Systems Waterfront Improvement Project
San Diego Unified Port District BAE Systems Waterfront Improvement Project