Fender Systems Replacement Project

4 Documents in Project

Summary

SCH Number
2019039040
Lead Agency
San Diego Unified Port District
Document Title
Fender Systems Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
3/15/2024
Document Description
The San Diego Water Board issued a Clean Water Act section 401 water quality certification (Certification No. R9-2024-0050) to the Project Applicant to remove 247 damaged steel H-piles and associated fender systems and install 258 steel H-piles and associated fenders systems of the same size along Piers 1 and 3 and Building 13 Wharf (approximately 2,670 linear feet). Additionally, as-needed fender pile replacement of up to 195 H-piles and associated fender assemblies (not more than 39 replacements per year) on Piers 1 and 3 over the 5-year term of the permit is proposed to address damage associated with occasional vessel strikes. Project activities will result in permanent impacts to aquatic resources under the jurisdiction of the San Diego Water Board from the installation of additional fill and over-water surface water cover from current conditions. Unavoidable project impacts will be mitigated through the restoration of eelgrass habitat in San Diego Bay.

Contact Information

Name
Lisa Honma
Agency Name
RWQCB - San Diego Region
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Name
Eric Icke
Agency Name
BAE Systems San Diego Ship Repair, Inc.
Job Title
Vice President and General Manager
Contact Types
Project Applicant / Parties Undertaking Project

Location

Cities
San Diego
Counties
San Diego
Regions
Southern California
Cross Streets
East Belt Street and Sampson Street
Zip
92113
Total Acres
2.2 ac
Parcel #
760-022-06
State Highways
I-5, SR-75, I-15, SR-94
Railways
BNSF, Amtrak
Waterways
San Diego Bay
Other Location Info
The project will occur in San Diego Bay waters within BAE Systems' leasehold from the Port District.

Notice of Determination

Approving Agency
RWQCB - San Diego Region
Approving Agency Role
Responsible Agency
Approved On
County Clerk
San Diego
Final Environmental Document Available at
The record associated with the San Diego Water Board’s decision is available to the general public at 2375 Northside Drive, Ste. 100, San Diego CA 92108, ph. 619-521-1990 (Electronic File No./PIN 884856).

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print