Project Info

Title
Heacock Street Truck Terminal Facility
Description
The project would include landscaping encompassing approx 1.43 acres. Open space (1.57 acres) and a retention basin (0.61 acre) are proposed south of the proposed parking area. South of the open space and retention basin is an existing retention basin that is not proposed to be modified, and it encompasses approx 0.6 acres. The project also includes the installation of two 36-in pipelines to connect to the existing two 36-in pipelines that convey surface water into the onsite drainage channel. The two proposed 36-in pipelines would convey storm water received offsite to the proposed open space. The surface water from the proposed truck parking area would be collected in pipelines that would convey the storm water to a proposed underground infiltration basin under the parking lot. The infiltration basin would have a capacity of approx 0.53 acre-feet after which storm water would be conveyed by pipeline to the proposed retention basin. Finally, the project includes the installation of a 12-ft high screen wall along the eastern and southern property lines.
Download CSV New Search

 

4 documents in project

Type Lead/Public Agency Received Title
March Joint Powers Authority Grant of Easements to Southern California Edison and the Western Municipal Water District for the installation of utility systems and improvements for the imple
March Joint Powers Authority Heacock Street Truck Terminal Facility
March Joint Powers Authority Heacock Street Truck Terminal Facility
March Joint Powers Authority Heacock Street Truck Terminal Facility