SCH Number 2018091036
Project Info
- Title
- 36-inch Transmission Main Replacement
- Description
- The project involves the installation of approx 16,500 lf of water transmission main and the abandonment of the existing main within the Sweetwater River valley. The majority of the transmission main would be installed within proximity to the existing alignment, while some portions would be realigned. The project has been designed so that construction activities would remian in previously developed areas to the maximum extent possble. The primary objective of the Project is to replace the ecisting main in order to ensure reliability of the treated water supply to Sweetwater Authority's customers throughout its service area.
2 documents in project