36-inch Transmission Main Replacement
2 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2018091036
- Lead Agency
- Sweetwater Authority
- Document Title
- 36-inch Transmission Main Replacement
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 12/13/2018
- Present Land Use
- public ROW; OS; Park/recreation
- Document Description
- The project involves the installation of approx 16,500 lf of water transmission main and the abandonment of the existing main within the Sweetwater River valley. The majority of the transmission main would be installed within proximity to the existing alignment, while some portions would be realigned. The project has been designed so that construction activities would remian in previously developed areas to the maximum extent possble. The primary objective of the Project is to replace the ecisting main in order to ensure reliability of the treated water supply to Sweetwater Authority's customers throughout its service area.
- Contact Information
-
Israel Marquez
Sweetwater Authority
Lead/Public Agency
505 Garrett Avenue
Chula Vista, CA 91910
Phone : (619) 409-6759
Location
- Coordinates
- 32°39'30"N 117°2'30"W
- Cities
- Chula Vista
- Counties
- San Diego
- Cross Streets
- Bonita Rd and Willow St
- Zip
- 91902
- Total Acres
- 20
- Parcel #
- various
- State Highways
- I-805, Hwy 54 & 125
- Schools
- Sunnyside ES, etc.
- Waterways
- Sweetwater River
- Base
- SB
- Other Location Info
- Bonita
Notice of Determination
- Approving Agency
- Sweetwater Authority
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- 505 Garrett Ave., Chula Vista, CA 91910
Determinations
- (1) The project will have a significant impact on the environment
- Yes
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.